ATA – SGO-1V4 Elite Installation Sheet
Swing Gate Opener Installation Instructions
Kit Contents
1. 1 x Gate Drive Unit SGO-1V4
2. 1 x Drive Arm Extension
3. 1 x Safety Slave Arm
4. 1 x Gate Mounting Bracket
5. 4 x Plastic Washer
6. 2 x Shoulder Screw 1615
7. 2 x Hex Head Screw M10 x 20
8. 2 x Spring Washer
9. 2 x Flat Washer
Tools Required
- Adjustable Wrench
- Socket set
- Drill
- Screwdrivers
- Marker Pen
Power Supply
Properly earthed 3 pin single-phase power is required.
WARNING! A portable power generator is not recommended due to spikes, surges and fluctuations in the supply.
CAUTION: do not use any cables which carry green/ yellow wires as this signifies earth, and do not comply with electrical authority regulations.
Initial Check
Before commencing installation, check the following:
a. The gate moves freely by hand for the full length of open and close travel.
b. The pier or post for mounting must be of solid construction (Brick, solid timber or steel). It must bear most of the force applied by the drive unit.
c. A weatherproof 240V 10A general purpose power point should be available within one metre of the pier/post. If two Elite® gate openers are required, provision for underground cabling should be made from one post to the other.
d. Ensure sideroom clearance is adequate. If there is not enough sideroom available, the Minimum Sideroom Kit is required.